| SN |
Project |
Work
Description |
Client |
Consultant |
Duration |
Start
Date |
1 |
Headworks Construction at Airport, Old
Salwa, Doha SW & Messaieed Town
|
Design works supply
and construction of 9 and 6 MIG RC reservoirs
at Old Airport and Mesaieed Town including
all necessary works of piping, electrical,
instrumentation, landscaping, drainage,
sewers etc, and approximately 60,000 ms
of 1200 mm
and 900 mm dia. Dl transmission and rising
mains in addition to approximately 8,000
ms of 400 - 600 mm dia. pipelines
|
KAHRAMAA
- Qatar General Electricity & Water
Corporation
|
2.5 years
|
25/5/08
|
2 |
Doha West Sewage Treatment
Works Extension No.3
|
Pipe installation for
the extension of Doha West Sewage Treatment
Plant. Most of the pipes within the STP
are ductile iron ranging in diameter from
150mm to 2.2 meters |
ASHGHAL
PWA - Infrastructure Affairs / Marubeni
|
1 year
|
10/5/08
|
3 |
Qatalum Project - Anode
Service Plant Civil Works |
Infrastructure construction
works including concrete slabs for large
industrial srtuctures in addition to sewerage,
stormwater drainage, potable water, irrigation,
telecommunication and roads networks |
Kempe
Engineering Services (Australia) |
1 year |
15/01/2008 |
4 |
Energy City Qatar –
ECQ1 Civil Infrastructure Work |
Complete infrastructure
works for the Energy City including stormwater
drainage, sewerage, potable water, irrigation,
power, telecommunication, traffic signals,
and roads networks |
QATARI DIAR / Energy
City – Qatar |
KEO International Consultants |
1 and half year |
23/12/2007 |
5 |
Al Udeid Project –
QEAF Relocation Package Phase 1 |
Construction of roads
and aeronautical pavements |
Rizzani
de Eccher S.p.A. Italy |
3 years |
03/12/2007 |
6 |
DSC 0039 C1 - Doha &
Rayyan Sewerage Schemes Construction of
Muraikh Area Drainage & Outfall Civil
Project 565 |
Cosntruction of 18 Km
surface water pipe lines by Microtunnel
(dia 1500, 2000 and 2400mm depths up to
20 m) / trenching and conventinal systems
(dia 800 to 2000 mm). Construction of underground
Tank capacity 50,500 m3 and pump station. |
ASHGHAL PWA - Drainage
Affairs |
KEO International Consultants |
2 and half years |
01/11/2007 |
7 |
GTC/124/2006/C –
Package 3
Qatar Power Transmission System - Expansion
– Phase VII (Power Cables) |
Installation of 56 km
high voltage power (Two 2 x 66 kV lines)
underground cables |
KAHRAMAA
/ Marubeni Corporation |
1 year |
22/10/2007 |
| SN |
Project |
Work
Description |
Client |
Consultant |
1 |
Panceltica – Housing
Project Infrastructure (Design and Construct) |
Complete design and
construction of infrastructure works of
2 sites (995 flats in each site) including
concrete slabs for buildings and sewerage,
stormwater drainage, potable water, irrigation,
telecommunication and roads networks |
Panceltica |
ASCO Consulting Engineer
|
2 |
GTC98/2005 Water Supply
to New Doha International Airport |
Installation of 11 km
of 900 mm diameter ductile iron pipework
(Design and Construct) |
KAHRAMAA
- Qatar General Electricity & Water
Corporation |
3 |
GTC 117/2006- Power
Supply to New Doha International Airport
And RAA Substation |
Installation of high
voltage power (Two 2 x 66 kV lines) and
optical fibre underground cables |
Marubeni
Corporation |
4 |
ERC1400D20/C4 Doha
Expressway D-Ring Road Interchang: Joint
venture project between QBC & Terna
S.A GEK GROUP
Doha
Expressway - Image Gallery » |
5 km three lanes dual
Expressway, three level interchange, bridge
and underpass structure, Public utility
services/networks, microtunnels 2000 mm
dia 2.5km, pavement, lighting and intelligent
transportation systems. |
ASHGHAL PWA - Roads
Affairs |
ITALCONSULT |
5 |
DFC0340 Doha & Rayyan
Sewerage PS 25 & 26 Catchments Sewerage
Phase 2 Civil Project 622/2 |
Cosntruction of 6 Km
trunk sewer pipe network by Microtunnelimg
dia. 600mm to 2000 mm at depths up to 20m,
Construction of underground Tank 4860m3
and temporary pump station. |
ASHGHAL PWA - Drainage
Affairs |
GHD GLOBAL |
6 |
DFC 0358 Completion
of Diplomatic Area Pumping Station Phase
1 Civil Project 621/2 & 622/3 Diplomatic
Area - Image Gallery »
|
Construction of underground
main surface water and sewerage tanks capacities
13,350m3, and 4,500m3, with 900 l/sec Pump
Station, along with 450 and 900 mm dia pipeline
and outfall structure for West Bay towers
area. |
ASHGHAL PWA - Drainage
Affairs |
Khatib & Alami |
7 |
GTC/5/2004 Qatar Transmission
System Expansion Phase VI – Lot 2
Trenching and EHV Cables Installation |
Installation of high
voltage power (Two 2 x 66 kV lines) and
optical fibre underground cables |
ABB –
Nexans Consortium |
8 |
ERC 1400 C4 Development
of Airport Road Al Matar Street Contract
Sign - Image Gallery »
Al-Matar
Works- Image Gallery » |
Upgrading and reconstruction
of 3 lanes double carraigeway Al Matar Street
7 Km long including Public utility services:
(Water, Electricity , Drainage networks),
Street lighting, Landscaping & irrigation
works, and 5 traffic signals. |
ASHGHAL PWA - Roads
Affairs |
Concer |
9 |
DFC 0337 Doha and Rayyan
Sewerage Abu Hamour Area Sewerage Phase
1, Civil Project 624 & 625 |
Cosntruction of 50 Km
trunk, branch and lateral sewers lines by
Microtunnel / trenching and conventinal
systems. |
ASHGHAL PWA - Drainage
Affairs |
KEO International Consultants |
10 |
GTC/41/2003 Extension
and Looping of Water Distribution Mains
in Al-Khor & Vicinity |
Installation of 120
km of ductile iron water pipe networks for
Al Khor City |
KAHRAMAA
- Qatar General Electricity & Water
Corporation |